(Summary description)Design determines the layout and functionality of the entire home. It can be said that a comfortable home environment first requires good design. Home design should pay attention to five key points: 1 Be careful to avoid designing locations that have not been considered for kitchens or bathrooms as kitchens or bathrooms; Try not to move or relocate existing floor drains, risers, etc;
How to prevent water seepage and leakage in homes
(Summary description)Design determines the layout and functionality of the entire home. It can be said that a comfortable home environment first requires good design. Home design should pay attention to five key points: 1 Be careful to avoid designing locations that have not been considered for kitchens or bathrooms as kitchens or bathrooms; Try not to move or relocate existing floor drains, risers, etc;
- Categories:Waterproofing
- Author:
- Origin:
- Time of issue:2020-06-10 16:38
- Views:
This article will provide suggestions for creating a beautiful and healthy home environment from four aspects: preparation work, decoration design, material selection, and construction process.
Prepare work step by step and avoid taking shortcuts
1. Conduct an inspection of the original house. Mainly check if there are any leakage marks around the balcony, bathroom, kitchen floor drain, riser, etc. If there are, they need to be treated first.
2. Conduct a closed water test. Thoroughly inspect for any water leakage. For example, after the construction of the bathroom is completed, all the sewers in the bathroom should be blocked, and a 25cm high "threshold" should be built at the entrance, and then 20cm high water should be poured into the bathroom. After 24 hours, check the surrounding walls and floors for any leakage.
3. Obtain the water pipe routing diagram of the original house for targeted maintenance.
Five key points to pay attention to in decoration design
Design determines the layout and functionality of the entire home. It can be said that a comfortable home environment first requires good design. Home design should pay attention to five key points:
1. Pay attention to avoiding designing locations that have not been considered for kitchens or bathrooms as kitchens or bathrooms as much as possible; Try not to move or relocate existing floor drains, risers, etc;
2. Pay attention to the correct and reasonable slope size, direction, etc. of the balcony, kitchen, and bathroom floor. According to the "Acceptance Measures for Home Decoration Projects in Guangzhou", the drainage slope of the bathroom floor should be maintained at 2-3%;
3. Pay attention to strengthening weak areas and provide detailed drawings. Attention should be paid to the holes where various pipelines pass through the wall. There should be no accumulated water inside the holes, and the edges of the holes should not be treated carelessly;
4. Pay attention to combining flexible waterproofing with rigid waterproofing. Generally speaking, rigid waterproofing refers to using cement mortar as raw material for waterproofing treatment, while flexible waterproofing refers to using waterproof coating for brushing or spraying. A more reliable measure is to first perform rigid waterproofing and then apply waterproof coating;
5. For villas with rooftop swimming pools, professional waterproof design should be carried out for renovation and decoration of old houses.
Material selection, drainage and odor prevention mainly rely on materials
Home waterproofing and odor prevention mainly occur in three places: kitchen, bathroom, and balcony. Moreover, in addition to strict requirements for construction technology, the most important thing for drainage and odor prevention is to choose suitable materials. This mainly includes the following two aspects:
1. Material selection
Firstly, the water pipes used for sewage discharge in the house must be equipped with water traps; If there is no water trap, we should also find a way to remedy it. For example, if there is no water trap in the kitchen beforehand, it is necessary to use a flexible hose to bend and connect the sewage pipe before entering the drainage pipe, artificially creating an effect equivalent to a water trap.
Secondly, qualified products (such as Kran copper pipes, Rifeng pipes, Liansu pipes) or advanced PPR pipes (such as Pilsa, Gudi pipes, etc.) should be selected for water supply pipes, drainage pipes, joints, etc. These products have the characteristic of not rusting, and the hot melt welding process eliminates water leakage from the joints.
Third, waterproof materials shall be selected from materials with excellent performance, such as "Linle", "Degao", "Sika", etc.
Fourthly, qualified products (such as Kran copper pipes, Rifeng pipes, Liansu pipes) or advanced PPR pipes (such as Pilsa, Gudi pipes, etc.) should be selected for water supply pipes, drainage pipes, joints, etc. These products have the characteristic of not rusting, and the hot melt welding process eliminates water leakage from the joints. Floor drains must use odor proof types. According to Zhu Jianfu, the price of odor proof floor drains is generally only slightly higher than that of ordinary floor drains, so there is no need to worry about the price burden.
Fifth, when choosing a grout, waterproof performance, adhesive performance, weather resistance, etc. should be considered.
Sixth, environmentally friendly water pipes should be used.
2. Construction technology
Firstly, the ground slope and pipeline slope must be correct and reasonable. Generally speaking, the slope of plastic pipes for domestic sewage should comply with the following regulations: the slope for a diameter of 50 millimeters is 25 ‰, and the minimum slope is 12 ‰; The slope for a diameter of 75mm is 15 ‰, and the minimum slope is 8 ‰; The slope of a pipe diameter of 110 millimeters is 12 thousandths, and the minimum slope is 6 thousandths.
Secondly, it is necessary to choose a reasonable pipe diameter and direction.
Thirdly, during the construction process, attention should be paid to taking measures to prevent blockages. The construction process should be rigorous and cautious, avoiding carelessness. Once the design drawings are ready and the materials are selected, it is time for the specific construction process. At this point, one must not be careless. If errors occur during the construction process due to carelessness, it can affect the appearance of the building or directly impact the physical and mental health of residents.
To achieve a beautiful and comfortable home environment, the construction process must adhere to the following 15 points:
1. The waterproof base layer should be dense, smooth, and dry.
2. The waterproof height is correct and reasonable; When taking a shower in the bathroom, water may splash onto adjacent walls. Without waterproof treatment, adjacent walls and opposite corner walls are prone to moisture and mold growth. So it is necessary to do a good job of waterproofing the floor before laying tiles. If there is a cabinet next to the interior wall, it should be 1.2 meters high. However, if it is a non load bearing lightweight wall, it is best to make the entire wall waterproof and at least 1.8 meters high.
3. Make rounded corners in the corners and other areas.
4. When laying floor tiles, wet laying techniques should be used as much as possible.
5. Strictly follow the design requirements to find slopes.
6. It is prohibited to cut grooves and run pipes on the ground to damage the original waterproof layer.
7. Pay special attention to the construction of the surrounding areas such as chimneys, floor drains, and risers.
8. Waterproof coating should be applied multiple times, and each coat should be dried before applying the next coat; The directions of two adjacent brushing should be perpendicular to each other. 9. After applying waterproof coating, pay attention to protection to avoid damage.
10. The joint filling agent should be dense and uniform, and it is strictly prohibited to miss the joint filling.
11. The wall and floor tiles in the bathroom and kitchen should be closed correctly and reasonably; For example, the tiling of the bathroom should be done by pressing the wall tiles against the floor tiles, and then laying the adjacent wall tiles after the floor tiles are laid.
12. The cement mortar ratio is reasonable and waterproof agent is added.
13. Conduct pressure testing, water splashing, and closed water testing.
14. Mark the pipeline route in a timely manner and draw a pipeline route diagram.
15. For villas with top-level swimming pools and renovated old houses, waterproof construction organization design should be carried out.
Scan the QR code to read on your phone
Juxuan Decoration integrates space design, construction, and materials, and has adhered to the principle of "putting human habitation first and quality first" since its establishment; Providing attentive service to over 10000 households in Guangfo area; Currently, Juxuan Decoration has direct subsidiaries in Tianhe, Panyu, Foshan, and Huizhou in Guangzhou; The company has a team of 100 active chief designers and a main material exhibition hall of nearly 5000 square meters; The direct management engineering team has over 500 people.
-Follow us-
Add:Units 634-635, 6/F, Zhongtai International Plaza, No.161 Linhe West Rd., Tianhe District, Guangzhou
Tel:400-838-2982
E-mail:info@junshine.cn